The ideas also contain a major battery at the site, to make sure excess energy could be stored to the night, and also a 220 kV transmission line that may connect the project to the North Star sub-station, around wherever a different one hundred MW solar venture can be staying https://totalsolar.com.au/wp-content/uploads/2024/10/SeraphimSIVN-TOPcon_SRP-425.440-BTD-BG-AU.pdf