1

Penmann Ltd completes comprehensive HVAC refurbishment for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The contract covered the design, supply, installation and commissioning of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://wavesocialmedia.com/story6323495/the-penmann-team-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-liverpool-site-supporting-fsi-phase-1-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story